
Peninsula Rail 2000 is now BayRail Alliance
| RAIL TOPICS | About Us | Updates | Media | Newsletter | Join us! |
This memo (PDF, 511k) explains, as of October 2003, that VTA knew that even with the maximum possible cash flows from all sources (an unrealistic assumption) it could not build BART to San Jose, let alone operate it. Here are the supporting spreadsheets (PDF, 36k).
©2003 BayRail Alliance. All Rights Reserved.